Installation Guide
VidiMax Hardware Installation
Unpack, place, cable and power up the VidiMax Server and Display Terminal Units, with wiring diagrams and troubleshooting for each deployment scenario.
01System Overview
The VidiMax system consists of two hardware components: the VidiMax Server and the VidiMax Display Terminal Unit (DTU). The server is the central controller: it hosts the web interface, manages all connected displays, runs automation tasks and communicates with connected Linortek devices. The Display Terminal Unit is the client device that connects to a screen and renders the content the server sends to it.
This guide covers the physical installation of both components. After completing it, refer to the VidiMax User Manual for software configuration.
What Is in the Box
VidiMax Server
- VidiMax Server unit (Mini-ITX form factor)
- Power supply and power cable
- Ethernet cable
VidiMax Display Terminal Unit (DTU)
- Display Terminal Unit
- HDMI cable
- Ethernet cable (for PoE connection)
A PoE switch or PoE power injector/adapter is required to power the Display Terminal Unit but is not included. See Power over Ethernet (PoE) Requirements.
System Components
| Component | Description |
|---|---|
| VidiMax Server | A compact Mini-ITX PC that acts as the central controller for the entire system. Hosts the web-based management interface, manages all display content and communicates with connected Linortek devices. Can be placed on a desk or shelf, or mounted using a compatible Mini-ITX bracket or enclosure. |
| Display Terminal Unit (DTU) | A compact client device that connects to a display screen via HDMI. Powered over Ethernet (PoE), so no separate power cable is required. Receives content from the VidiMax Server and renders it on the connected screen. |
| Linortek Devices (optional) | Bell controllers, tone generators, relay controllers and other Linortek accessories that connect to the VidiMax Server via Ethernet. These are configured separately and are not covered in this guide. |
Deployment Scenarios
VidiMax supports three deployment scenarios. They can also be combined, for example using Interface 1 for remote administration while running displays on a dedicated network through Interface 2.
Scenario A – Standalone (No External Network)
The VidiMax Server operates entirely without connecting to an existing network. The server provides its own DHCP network from its DHCP port (Interface 2), and all display terminals and Linortek devices connect to a PoE switch on that port. The server is managed locally using a display and keyboard/mouse connected directly to the server.
- Best for: environments where connecting to an existing IT network is not desired or not possible.
- Requirements: a display and keyboard/mouse connected directly to the server, and a PoE switch connected to Interface 2 to power DTUs and Linortek devices.
Scenario B – Network Connected
The VidiMax Server connects to your existing LAN via Interface 1 and also uses Interface 2 to provide a dedicated managed network for display terminals and Linortek devices. The server is administered through a web browser on any networked computer. This is the most common deployment for larger installations, where a clean separation between the managed device network and the main LAN is preferred.
- Best for: most installations. Allows remote administration from any networked computer without a dedicated monitor or keyboard at the server.
- Requirements: an available Ethernet port on your network switch or router for Interface 1, and a PoE switch connected to Interface 2 for displays and devices.
Scenarios can be combined. For example, use Interface 1 for remote web administration while Interface 2 provides a dedicated network for displays and devices.
Scenario C – Network Connected, Displays on Main LAN (ETH2 Not Used)
The VidiMax Server connects to your existing LAN via Interface 1 only, and Interface 2 (ETH2) is left unused. Display terminals and Linortek devices are connected to the same LAN as the server and are discovered automatically. This is the simplest setup when your existing network already has PoE switching and all devices can be placed on the same network segment as the server.
- Best for: environments where the existing network already supports PoE and all devices can be placed on the same VLAN or network segment as the server.
- Requirements: an available Ethernet port on your network switch or router for Interface 1, and a PoE-capable switch on the same network to power DTUs and Linortek devices. ETH2 is left disconnected.
02Pre-Installation Checklist
Complete this checklist before beginning installation to make sure you have everything you need.
Site Preparation
- Installation location identified for the VidiMax Server: a stable surface with adequate ventilation.
- Power outlet available within cable reach of the server location.
- Mounting location identified for each Display Terminal Unit.
- Cable routing path planned from the PoE switch to each DTU location.
- Cable routing path planned from the server to the network switch (Scenario B).
Equipment
- VidiMax Server unit received and undamaged.
- Power supply and cable included and undamaged.
- One Display Terminal Unit per screen received.
- HDMI cable included with each DTU.
- Ethernet cable included for each DTU.
- PoE switch or PoE power injector available, with enough PoE ports for all DTUs and Linortek devices. For Scenario C (displays on main LAN), confirm the existing network switches have available PoE ports.
- Network Ethernet cable available for the Interface 1 uplink (Scenario B).
- Display screens are mounted and their HDMI inputs are accessible.
Network Information (Scenario B)
- IP address range or DHCP availability confirmed with your IT team.
- Available port on your network switch identified for the Interface 1 uplink.
- If using a static IP: static IP address, subnet mask and gateway noted for configuration.
- Firewall or network access policy reviewed, if applicable.
After Installation: Handoff to Configuration
Once all hardware is installed and powered on, the software configuration phase begins. Refer to the VidiMax User Manual for:
03VidiMax Server Installation
The VidiMax Server is a compact Mini-ITX PC, fanless or low-noise, designed to be installed in a variety of locations, including server rooms, AV closets, back-of-rack spaces, or on a desk or shelf near the installation site.
Hardware Ports
Familiarize yourself with the server’s physical ports before beginning installation.
| Port | Label / location | Purpose |
|---|---|---|
| Ethernet – Interface 1 | ETH1 |
Uplink / LAN. Connects the server to your existing network or the internet. Use this port to allow remote web-based administration from networked computers. |
| Ethernet – Interface 2 | ETH2 |
DHCP / managed network (optional). Acts as a DHCP server for devices connected directly to this port. Use it when you want displays and Linortek devices on a dedicated network segment, isolated from your main LAN. If your displays and devices are already on your existing network, ETH2 is not required; the server discovers them through Interface 1. |
| Display port | DisplayPort or HDMI (varies by model) | Direct display output for local administration. Use this in Scenario A (standalone) or when initial setup is needed without a network connection. |
| USB ports (×2) | USB-A | Connect a keyboard and mouse for local administration. Only required in Scenario A or for initial setup without a network connection. |
| Power input | DC power jack or IEC connector (varies by model) | Connect the included power supply. Do not use a third-party power supply unless specified by your distributor. |
Placement
The VidiMax Server can be installed on a desk, a shelf or inside an AV cabinet. Choose a location that meets the following requirements:
- Ventilation – make sure there is adequate airflow around the unit. Do not place it in an enclosed space with no airflow, against walls on all sides, or under heavy objects.
- Cable reach – the unit must be within cable reach of a power outlet, your network switch (Scenario B) and the PoE switch that serves the display terminals.
- Access – the unit should be accessible for maintenance, cable management and visual inspection of its indicator lights.
- Environment – install in a dry, indoor location. Avoid excessive dust, moisture, direct sunlight and nearby heat sources.
Operating temperature, humidity limits and physical dimensions are listed in the product specification sheet included in the box.
Server Installation – Step by Step
Step 1 – Position the unit
- Place the VidiMax Server on a stable, flat surface such as a desk, a shelf or the top of an AV rack.
- Leave at least 5 cm (2 in) of clearance on all sides for airflow.
- Orient the unit so all ports are accessible and cables can be routed neatly.
Step 2 – Connect the PoE switch (Interface 2, DHCP port)
- Connect one end of an Ethernet cable to Interface 2 (
ETH2) on the VidiMax Server. - Connect the other end to the uplink port of your PoE switch.
- The PoE switch’s access ports will later be used to connect Display Terminal Units and Linortek devices.
Do not power on the PoE switch yet. Connect the display terminals first (see Display Terminal Unit Installation), then power everything on in the order described in Power-On Sequence.
Step 3 – Connect to your network (Scenario B only)
- Connect one end of an Ethernet cable to Interface 1 (
ETH1, the uplink port) on the VidiMax Server. - Connect the other end to an available port on your network switch or router.
- The server obtains an IP address from your network’s DHCP server automatically on first boot. A static IP can be configured later through the web interface; see Network Configuration in the User Manual.
Step 4 – Connect a local display and keyboard (Scenario A or initial setup)
Skip this step if you are using Scenario B and will access the server through a web browser on your network.
- Connect a monitor to the server’s display port with an appropriate cable (DisplayPort or HDMI, depending on model).
- Connect a USB keyboard to one of the USB ports.
- Connect a USB mouse to the second USB port.
The display and keyboard connected to the server are for administering the server itself; this is not a display terminal. Do not use the same screen for both purposes.
Step 5 – Connect power
- Connect the included power supply to the power input on the VidiMax Server.
- Plug the power cable into a grounded power outlet or a UPS (recommended).
- Do not power on yet. Complete the display terminal connections first.
Always use the power supply included with the unit. An incorrect power supply may damage the hardware and will void the warranty.
Hardware Specifications
| Specification | Value |
|---|---|
| Form factor | Mini-ITX |
| Dimensions (W × D × H) | To be confirmed |
| Weight | To be confirmed |
| Power input | 5 V DC |
| Power consumption | To be confirmed |
| Operating temperature | 0 – 85 °C |
| Storage temperature | −40 – 125 °C |
| Ethernet ports | 2 × Gigabit Ethernet (RJ-45) |
| Display output | DisplayPort / HDMI |
| USB ports | 2 × USB-A |
Power-On Sequence
Power on the system in this order so the server is ready before the display terminals try to connect:
- Power on the VidiMax Server.
- Wait about 30 seconds for the server to fully boot.
- Power on the PoE switch.
- The Display Terminal Units receive power from the PoE switch and begin connecting to the server automatically.
The Display Terminal Units communicate with the server over the network. If the PoE switch is powered on before the server has finished booting, the terminals may show a connection error on first start. This resolves itself once the server is ready; no action is needed.
04Display Terminal Unit Installation
The VidiMax Display Terminal Unit (DTU) is a compact client device that connects to a display screen and renders content sent from the VidiMax Server. Each DTU is powered entirely over its Ethernet cable using Power over Ethernet (PoE), so no separate power supply or outlet is needed at the screen location.
Hardware Ports
| Port | Purpose |
|---|---|
| Ethernet (RJ-45) | Connects the DTU to the network and provides PoE power. This single cable carries both data and power. Connect it to a PoE port on a switch that has network access to the VidiMax Server, either on the dedicated managed network (Interface 2) or on your main LAN (Scenario C). |
| HDMI | Connects the DTU to the display screen. Use the included HDMI cable. The DTU outputs video and audio to the screen over this connection. |
Power over Ethernet (PoE) Requirements
The Display Terminal Unit is powered only over its Ethernet cable, so a PoE power source is required. You have two options.
Option A – PoE switch (recommended for multiple DTUs)
A PoE-capable network switch provides both network connectivity and power to all connected DTUs through a single cable per unit. This is the recommended option when installing two or more display terminals.
- Make sure the switch supports IEEE 802.3af (PoE) or IEEE 802.3at (PoE+). Confirm the required standard in your product datasheet.
- Connect the switch’s uplink or WAN port to Interface 2 on the VidiMax Server, or to your main network switch if using Scenario C (displays on main LAN).
- Connect each DTU to an available PoE access port on the switch.
Option B – PoE power injector / adapter (for a single DTU)
A PoE power injector (also called a PoE adapter or midspan injector) can power a single DTU without a PoE switch. The injector sits between a standard Ethernet port and the DTU’s Ethernet cable.
- Connect the injector’s data in port to any available Ethernet port on a switch that has network access to the VidiMax Server: either the Interface 2 PoE switch or your main network switch (Scenario C).
- Connect the injector’s data + power out port to the DTU’s Ethernet port.
- Power the injector from a standard power outlet.
Do not try to power the Display Terminal Unit from a non-PoE Ethernet port. The unit requires PoE and will not work without it.
Placement and Mounting
The Display Terminal Unit is designed to be mounted directly behind or underneath the display screen, keeping the installation clean and cable runs short. Most installations use one of these mounting methods:
- Adhesive or bracket mount – mount the DTU to the back or underside of the display frame with adhesive strips or a small shelf bracket.
- Surface mount – place the DTU on a shelf or surface directly below or behind the display if concealment is not required.
Keep the Ethernet cable run between the PoE switch and the DTU as short as practical. The maximum recommended run is 100 m (328 ft), per the 802.3 standard.
DTU Installation – Step by Step
Step 1 – Mount the DTU
- Choose the mounting method that suits your screen and location.
- Place the DTU on a shelf, or secure it to the back of the display frame.
- Make sure the HDMI and Ethernet ports remain accessible.
Step 2 – Connect the HDMI cable
- Connect one end of the included HDMI cable to the HDMI port on the DTU.
- Connect the other end to an available HDMI input on the display screen.
- Note the HDMI input number on the screen (e.g. HDMI 1, HDMI 2). You will select this input in the screen’s menu after powering on.
Step 3 – Connect the Ethernet cable
- Connect one end of the Ethernet cable to the Ethernet port on the DTU.
- Route the cable to the PoE switch. Use cable clips, conduit or cable trays to keep the run tidy and protected.
- Connect the other end to an available PoE port on the switch.
- Do not power on the PoE switch yet. Complete all DTU connections first.
Step 4 – Power on
Once all DTUs are connected, power on the system in the order described in Power-On Sequence:
- Power on the VidiMax Server first and wait 30 seconds for it to fully boot.
- Power on the PoE switch. Each DTU receives power through its Ethernet cable and boots automatically.
- Switch the display screen’s input to the HDMI port connected to the DTU.
- Within 30–60 seconds of the PoE switch powering on, each DTU should connect to the VidiMax Server and show the default Time & Date slate (or its configured default content, if already set up).
If a DTU does not appear in the VidiMax display list after 2–3 minutes, see Troubleshooting: Display Terminal Unit.
DTU Hardware Specifications
| Specification | Value |
|---|---|
| Dimensions (W × D × H) | 109 × 47 × 168 mm |
| Weight | 360 g |
| Power method | Power over Ethernet (PoE) |
| PoE standard | 802.3af / 802.3at |
| Power consumption | To be confirmed |
| Operating temperature | 0 – 85 °C |
| Ethernet port | 1 × 10/100/1000 Mbps (RJ-45) |
| Video output | 1 × HDMI |
05Wiring Diagrams
The diagrams below show the cable connections for Scenarios A and B. Use them as a reference when planning your installation.
Scenario A – Standalone (No External Network)
Scenario B – Network Connected
06Troubleshooting
Use the tables below to diagnose and resolve common installation issues. If a problem is not listed or the suggested resolution does not help, contact your VidiMax distributor or support@linortek.com.
VidiMax Server
| Symptom | Check / resolution |
|---|---|
| Server does not power on | Confirm the power cable is fully seated at both the unit and the outlet. Confirm the outlet is live by testing it with another device. Confirm the correct power supply is being used. |
| Server boots but cannot be reached on the network (Scenario B) | Confirm Interface 1 (ETH1) is connected to your network switch or router. Check that your network’s DHCP server is active and has available addresses. Connect a monitor and keyboard directly to find the assigned IP address. If using a static IP, verify the address, subnet mask and gateway in the network configuration. |
| Web interface is not accessible from a browser | Check you are entering the correct IP address, including the https:// prefix. Confirm your computer is on the same network as the server. Clear the browser cache or try a different browser. Confirm the server has fully booted (allow up to 1 minute after power on). |
| PoE switch on Interface 2 receives no DHCP addresses | Confirm the server was fully booted before the PoE switch was powered on. Go to Admin › System Config › Network Configuration › DHCP Server and confirm Enable DHCP Server is checked and the DHCP range is set. Click Save if you make changes and allow 30 seconds. |
| Local display (connected directly to the server) shows no output | Confirm the cable is in the correct port on the server (DisplayPort or HDMI, depending on model). Confirm the display is set to the correct input. Try a different cable. Allow up to 90 seconds after power on for the display output to start. |
Display Terminal Unit
| Symptom | Check / resolution |
|---|---|
| DTU does not power on (no indicator light, no HDMI output) | Confirm the Ethernet cable is in a PoE-capable port on the switch and the PoE switch is powered on. Try a different PoE port. Verify the switch supports the required PoE standard (802.3af or 802.3at; see the product datasheet). Try a different Ethernet cable. |
| DTU powers on but the screen shows no picture | Confirm the HDMI cable is connected at both ends and the screen’s input is set to the correct HDMI port. Try a different HDMI cable, or a different HDMI input on the screen. |
| DTU does not appear in the VidiMax display list | Confirm the PoE switch has network connectivity to the VidiMax Server, either through Interface 2 (ETH2) or through the main LAN (Scenario C). Allow 2–3 minutes after the PoE switch powers on. If using Interface 2, confirm the server’s DHCP server is active (Admin › Network Configuration › DHCP Server). If using Scenario C, confirm your main network’s DHCP server is assigning addresses. Check the server’s Logs page for connection events. |
| DTU appears offline in the display list | Check the Ethernet cable at both the DTU and the PoE switch port. Confirm the switch port is active, or try a different PoE port. Reboot the DTU by disconnecting and reconnecting the Ethernet cable. |
| DTU connects but shows a black screen or an error message | The DTU has connected to the server but no content has been configured yet. This is expected on a new installation. Log in to the VidiMax web interface and set the display’s default slate; see Displays in the User Manual. |
| Only some DTUs appear in the list | Check that the DHCP address range (Admin › Network Configuration › DHCP Server) has enough addresses for all devices. For example, 10.0.0.10–10.0.0.100 supports up to 91 devices. Extend the range if needed, and confirm every DTU is in a PoE port (not a non-PoE port) on the switch. |
General Network Issues
| Symptom | Check / resolution |
|---|---|
| Linortek devices not discovered on the Devices page | Confirm the device is on the same network as the VidiMax Server: connected to the Interface 2 PoE switch, or on the main LAN (Scenario C). Confirm it is powered on and its indicator lights show a valid network connection. Allow 1–2 minutes after booting. Check the device’s own web interface by opening its IP address from a computer on the same LAN. |
| NWS weather alerts not triggering | Weather alert polling requires internet access on the VidiMax Server. In Scenario B, confirm Interface 1 is connected and the server has a valid gateway. Go to Admin › Network Configuration › LAN and verify the Gateway field is filled in. |
Still stuck? Our support team can help with setup and configuration.