Wiring Guide
Ultra 300 Wiring Diagram for Two Step-Up Relays
How to wire two groups of low-voltage bells to the Ultra 300 Ethernet I/O controller through two step-up relays, with a push button for manual ringing.
01Before You Start
In this setup, the Ultra 300 drives two step-up relays, and each relay switches the power to a group of three 12 V bells. Use step-up relays when the bells draw more current than the Ultra 300’s own relays can switch.
The wiring sample is for demonstration only. You can extend the wires as needed during installation.
| Wire gauge | Maximum distance from the controller |
|---|---|
| 16 AWG | Up to 500 ft, with the supplied power supply |
| Thicker wire (14 or 12 AWG) | Longer runs are possible |
When you use the supplied WAGO connectors, insert only the bare copper wire into the slot. Keep the insulation outside the connector.
02Wiring Diagram
- Ultra 300: powered by a 12 V, 1 A supply.
- Step-up relays: the coil terminals (
A1,A2) connect to the Ultra 300’s relay outputs R1 and R2 and its V terminal. The contacts (11,14) switch the bell power. - Bells: two groups of three bells in parallel. Each group has its own 12 V, 4 A power supply, wired through one relay’s contacts.
- Button: connected to input IN1 (terminals C and A).
Make sure each step-up relay’s rated current is higher than the total current of the bells it switches. Choose the relays before installation to avoid overloading them.
Still stuck? Our support team can help with setup and configuration.
