View Categories

Netbell-Ultra300 Wiring Diagram

Please note: The wiring samples shown here are for demonstration purposes only. When installing the device in your facility, you can extend the wires as needed. With the power supply we provide, you can wire the bell/buzzer up to 500ft away from the controller using 16AWG cable. The larger the wire gauge, the longer the possible distance.

If using provided WAGO connectors, only insert bare copper wire into the slot, avoiding the insulated part.

Verify that the step-up relay’s rated current capacity exceeds the bell’s load current. Relay selection should be planned in advance to avoid overloading.

Wiring Bells to Netbell-Ultra300 Using Step-Up Relays

Wiring Bells to Netbell-Ultra-E